Cable Installation

Cable Installation

Our base Cable Pull package is designed to cover all aspects of tower works. Team activity logs provide details data for DPR’s whilst pictures and check list give you piece of mind outlining what actual works has been completed. Outputs from the DPR can be used in tracking the progress of Tower Preparation, Pull in activity & Logs, As found & Left reports. In customising the reports current user can automatically produce a large percentage of their as built reports ready for submission.
  • Team activity logs capturing critical timings and values of events
  • Check list for prep teams with on device engineering drawings to remined them of rigging configurations
  • As found / left reporting. Images can be imprinted with time, date and asset numbers
  • On device procedures give instant access to critical documents
  • DPR sent to OCM’s for approval
  • As built report sent directly engineers
  • Reduced administration and time of reporting
  • Dash board over views showing progress and detail data of events